That bank still owns two of the houses which are pretty much complete, but sold the other two houses and the rest of the land to another builder. The bank's two houses are done on the inside but need everything outside: final grade on the lot, landscaping, sod, driveway, sidewalks, gutters. The bank has listed the two houses on MLS, even though they can't get a habitability permit now because the road has not been installed in the development (which will be done by the other builder that bought the rest of the land) and the sewer and water lines need to be backflushed and connected, which won't be done until the road is done. We were told that at least a hundred people had inquired about the houses but were scared away by the unknowns: when will the city services be available, what will be built on the rest of the land adjacent to these houses, etc. The up-side to the decision is that the houses are listed at about 60% of what they would have sold for had they been completed as originally planned, and are still well under actual value even though without the planned amenities from the original development they wouldn't be worth that much now.
This is what it looks like right now:
It's like a completed house sitting in the middle of a construction site. Since it's the first house on the street, on the corner of the main road, it is somewhat separated from the rest of the development and may not be as affected by what else is built as the other houses further up the street will be.
The inside is very cool, by the way. The kitchen is to die for - plenty of cherry cabinets, granite, the works. It doesn't have appliances yet but the realtor said to specify what we wanted in the contract and the bank would install them. There are build-ins in the living room, a sunroom, nice large baths, the works.
So our dilemma is this: this house is a good fit for what we have to have in a new home - slab construction with no steps, roomy, good use of space, well designed and constructed, attractive, small yard. But the downsides are almost too much to consider: Will the bank accept a contract that specifies that they must complete all the remaining work on the lot and house? How much of a pain will it be to get that work done correctly? When will the new builder put in the road (it's been delayed three or four times already this year)? How long will it take for the final city inspections and the habitability permit to be issued? What will be built on the rest of the land - will those houses affect the value of the ones already built? Could the builder put up apartments or something else instead (that's completely possible but not as likely)?
And - very important - will the new builder know what he's doing with respect to water control and drainage or will we have to worry about that too? That's a biggie because on our last house we had water issues in the basement when it rained hard due to the bad runoff control in the subdivision. This house is the first one on the road, and the land slopes uphill slightly from the main road to the back of the development. The original builder was very good at runoff control and we wouldn't have had a concern if he was still in the picture, but this area has become infamous in my eyes for builders that don't have a clue how to handle grading lots to avoid water issues. We have seen damp crawlspaces and basements and water problems everywhere we've looked.
That's a lot of issues to grapple with. Add to it the whole "Do we want another free-standing house with yard issues or should we just buy a condo and not have to take care of the outside?" and I'm in a complete tizzy. I'm good with problems where you solve for an answer and get THE answer - like math - but these fuzzy decisions completely stymie me.
Any thoughts?
I looked at it and said, "Well, it's a paste-up job but it's cool." Husband, the expert of all things photographic, pronounced it photoshopped but well done.